log [2021/05/27 00:24] – [12th meeting (2021-05-28)] team3log [2021/06/17 11:29] (current) – [14th meeting (2021-06-02)] team3
Line 1: Line 1:
 ======Logbook====== ======Logbook======
-//This is your logbook. Insert here all relevant information regarding the evolution of your project//+
 ===== Weekly Report ===== ===== Weekly Report =====
 ==== 1st Week Report ==== ==== 1st Week Report ====
Line 19: Line 19:
 ==== 5th Week Report ==== ==== 5th Week Report ====
 This week was a bit shorter because of Easter holidays. We finalized our tech course classes and presented our final proposal; a flexible home desk. We'll continue by making some sketches and thinking about the features we want to include in our desk.  This week was a bit shorter because of Easter holidays. We finalized our tech course classes and presented our final proposal; a flexible home desk. We'll continue by making some sketches and thinking about the features we want to include in our desk. 
 +==== 6th Week Report ====
 +This week was also shorter due the Easter holidays. We worked on the chapters of the report in preparation for the interim report and started working on the cardboard model. 
 +==== 7th Week Report ====
 +This week we each worked on our chapters of the interim report and started making the presentation. 
 +==== 8th Week Report ====
 +We finalized the interim report and presentation, rehearsed it and then presented our work on thursday. 
 +==== 9th Week Report ====
 +This week we worked on our 3D model and started with the table of materials, something we should have started on. We also had a follow up team-building session and worked on the flyer. 
 +==== 10th Week Report ====
 +This week we worked on our final sustainability presentation in which we explain the measures we'll take to be more sustainable. We also worked on the leaflet. 
 +==== 11th Week Report ====
 +We each worked on our individual chapters following feedback. The 3D model is seperated in two parts; Gabriel is working on the mechanism and Anastasia on the wooden components (boxes+tabletop). We are making up our final list of materials needed for the prototype. 
 +==== 12th Week Report ====
 +We are finalizing the 3D model and purchasing materials for the prototype.  
 +==== 13th Week Report ====
 +We have sended the individual chapters to the professors, asking for feedback. The 3D model of the boxes is done and we're making technical drawings. The mechanism needs some more thought because there are some problems with the dimensions. 
 +==== 14th Week Report ====
 +This week we presented our marketing plan and our communication materials; the paper (draft), leaflet, poster (draft) and manual (draft). We further worked on the 3D model of the mechanism and discussed our doubts with the supervisors. 
 +==== 15th Week Report ====
 +The 3D model is finalized but we can't seem to reach our predetermined height of 120cm. We're looking into different mechanisms that can reach the additional 15cm we need for an ergonomic standing position. 
 ===== Meetings ===== ===== Meetings =====
  
Line 120: Line 140:
  
 === Minute: === === Minute: ===
 +During this meeting we started things off with showing our 3D model and we have asked questions about how we can improve it. Next we have discussed the prototype and how to construct it, what materials should we use. The last thing that we have discussed was the paper. After we got the instructions, we have got straight to work. 
 ==== 12th meeting (2021-05-28) ==== ==== 12th meeting (2021-05-28) ====
 === Agenda: === === Agenda: ===
   - Present list of materials for the prototype   - Present list of materials for the prototype
-  - Questions about the next deadline - functional tests (what is means) +  - Questions on flatpacking with/without runners 
-  - Questions on user manual guide+  - The next deadline
  
 === Minute: === === Minute: ===
-===== Activities ===== +During this meeting we have presented the way we will construct the prototype. Next we have discussed the packing. Lastly we have asked about the upcoming deadlines in order to deliver them on time.  
-//Please register here all accomplished project activities//+==== 13th meeting (2021-06-02) ==== 
 +=== Agenda: === 
 +  - Mechanism - explanations and suggestions 
 +  - Prototype questions: glue hinges 
 +  - Get to work
  
-^ Start      ^ End       ^ Task          ^Description ^  Who^ +=== Minute: === 
-     | +We explained our idea for the mechanism, this time showing the right drawings etc. which made things more clear. Some questions arose that we'll look into. We asked some of our questions regarding the prototype and received some additional components like hinges and arduino tools.  
-  |  |  |  |+ 
 +==== 14th meeting (2021-06-09) ==== 
 +=== Agenda: === 
 +  - Questions on Arduino and soldering 
 +  - Mechanism problem 
 +  - Question on 3D video  
 +  - Logbook activities? 
 + 
 +=== Minute: === 
 +During this meeting we started things off with some question about electrical equipment, Arduino and how to solder it. Then we moved on to our main problem which was mechanism. We were given instructions and adjusted to them. Finally we have talked about 3D visualization of our product.  
 +==== 15th meeting (2021-06-17) ==== 
 +=== Agenda: === 
 +  - Question about the LED Auto Sensor Lamp  - May you provide a new LED for us? 
 +  - 3D Model video 
 +  - Final presentation description - how is it going to be and assessment 
 + 
 +=== Minute: ===